These instructions will show you phase four of how to install a stellar light package inside an innovative Sprung Structure. In this phase of installation you will:
Install the AC Line Communicator
Cover the Quick Connect access point
Connect the power cable
WARNING – Risk of Electric Shock. Maximum connected load with a single power supply shall not exceed maximum ampacity rating of #18 AWG through-wire conductors. Avoid handling LEDs directly. Not intended for use in environments containing airborne corrosive agents such as chemical solvents, cleaners, or cutting fluids
DELIVERY: Upon receipt of fixture and accessories, inspect for any freight damage. All damage should be reported to the delivery carrier. Compare the catalog description listed on the packing slip with the fixture label to be sure you have received the correct merchandise.
Follow specific building lighting plans for installation location of each item.
20 amp minimum circuits are required for Stellar Smart Lighting Systems. A 20 or 30 AMP breaker should be used based on the amount of current for the designed load.
208VAC, 240VAC and 277VAC are the three voltages used. Each Stellar lighting is configured for ONE of these voltage, please ensure that the voltage provided and the Stellar Light match. The specific voltage can be found on the Safety label located on the light.
All wire runs and AWGs need to follow electrical code.
Power Cable
15″ standard or 30″ optional and ordered separately
Stellar Lights
(20”, 40”, 60”, 80” approx. lengths)
1. Once interior covering (membrane) is pulled over, a slight nub with show where the 4×4” J-Boxes and Quick Connects have been installed.
2. Use a box knife to carefully cut around Quick Connects. CUT AS CLOSE AS YOU CAN TO EXPOSE THE QUICK CONNECT ONLY.
3. Drill 2 holes in Sprung Interior PVC Cap to install AC Line Communicator.
• Small & Medium Sprung Beams: Drill holes 9” apart
• Large Sprung Beams: Drill holes 10 1/2” apart
4. Drill 2 holes in Sprung Interior PVC Cap to install Light assembly (hole distance will vary depending on light). Small & Medium Sprung Beams: Drill 3/4” holes; Large Sprung Beams: Drill 1” holes
1. Mark the location of the hanging bracket in the center of the interior PVC cap.
2. Using the correct hole saw drill a hole through the interior plastic cap making certain not to bore into the beam itself. [ 3⁄4” hole saw for 5”x10” beams or 1” hole saw for 8”x12” beams ]
3. Remove the excess cap material, cleaning the hole of debris.
4. Position a T-bolt into the aluminum beams bolt chase.
5. Turn the T-bolt clockwise 90 degrees and lock it into the bolt chase.
NOTE: that the indicator line on the end of the T-bolt running perpendicular to the length of the beam confirms that it is locked in place.
5. Install AC Line Communicator to Sprung beam using T-bolt hardware:
• Small & Medium (3/8”) or Large (1/2”)
6. Place 2 Hole Cover & Foam Assembly over Quick Connects THEN, plug AC Line Communicator power cord into large Quick Connect and TWIST connector cap to secure position.
FCC NOTICE: This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Any Changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate the device.